Here you can see a work with bars in length of 6m for the 90mm diameter filling lines as well as the 50mm diameter for the vapor recovery stage 1.
Depending on the preference of the installators, it can be interesting to use rolls of 100m on recovery vapor too - not only on the product lines to the dispensers.
It should be noticed that the carried out work is of a high degree of accuracy and quality.